The TO DO list and the DONE list on the first page have been updated. Please check them out if you want to know what's happening. The sixth floor (Orange, fishing style) is under construction. We have not yet chosen a color/materials theme for the seventh and final floor. If you have suggestions, post them please If you have a DC of End Stone Brick laying around, we could really use it for when we go to do the entrance link ups to the Nether Express. We seem to be doing great on materials otherwise. Thank you everyone that has come out to help or donated! Much appreciated! Hopefully this will be another fun build for everyone on EMC to use and enjoy You'll all be happy to know the build works extremely well. A little too well. Hard to work on it without "ghast guards" LOL.
The fun continues tonight. What time would everyone like to do? I'm free from now till like 9 or 10 pm tonight. Later if I get a second wind. Holler at me if you want to come out and have a time you want/need. If you are just seeing this for the first time, please check out the first and second posts on the first page, cheers
5-7 as a starting time. Might as well start early and get more done. That's my opinion, I feel like doing stuff today.
I just got notified I may be leaving in about an hour- three hours, so I'll see if I'm actually still around... Score for random visitors -.-
Alright folks, I'm going to hop on now and go till roughly 7pm. Then we'll see if I can manage a second wind for a late shift tonight for the vampires (and folks in other time zones lol). Playing that by ear though.
If you want to donate, thank you! If you want to sell PWU some of this, thank you! PWU has rupees. I might as well spend some. Materials needed for the last floor. I am guesstimating the quantities. Light blue glazed terracotta 4 stacks Blue glazed terracotta 4 stacks Cyan glazed terracotta 6 stacks Gray glazed terracotta 6 stacks Light gray glazed terracotta 10 stacks Cyan concrete 12 stacks Blue concrete 8 stacks Light blue concrete 8 stacks Cyan Terracotta 12 stacks For the entrance and tie ins to the Nether Express, we need at least 1-2 more DCs of End Stone Brick. That will be the LAST thing we build, so no rush. UPDATE: fBuilderS has gotten us all the glazed terracotta and is working on the concrete. Derp_Duckie is working on the light blue concrete. Thank you both so much!!!
Thank you everyone! I will be back online at 10pm tonight for a 2nd late night session <3 (I don't guarantee how long I'll last, but hopefully for an hour or two!)
How many punny people have we? "punny" doesn't count as a pun cause it ain't intended. Chris (Dice) and Shy, who else? But yes, yes indeed, good job John
I've put in for 3 quotes for movers. I've gotten the whole list organized for TO DO (boxes, tape, paper, etc). I've planned where existing furniture is going. I've gotten a great photo of Grammie's best painting to take to the printers. ETC!!! I think I've spent all of today so far on email and phone. /End Vent of trying to organize Grammie's estate. S4M will start sometime this evening between 5 and 8. Sorry I can't be more specific. I am at the mercy of the people who haven't called me back yet. Waiting on their phone calls.